First step towards the realization of a BIM project

Frigidmodels follows the BIM Standards: BS 1192-4:2014, PAS 1192-5:2015, BS 8536-1:2015, BS 8536-2:2016, BIM Protocol CIC/BIM Pro first edition 2013, Code of practice UK BIM Framework, BN EN ISO 19650 -1,  BN EN ISO 19650 -2

Pre-design PhaseDesign PhaseConstruction Phase

What can you expect?

Project Implementation Plan. Define the objective, design and develop plan, task details, establish a timeline and milestones

CPIx Resource Assessment

The CPIx Resource assessment form is referred to in clause 6.3.2 and 6.6 of PAS 1192-2, and informs the supply chain capability summary.

CPIx Supplier IT assessment

supplier IT assessment form provides a meaningful method of assessing supply chain Information Exchange capability and supply chain IT maturity

CPIx BIM Assessment

The BIM Assessment Form provides a meaningful method of assessing a project member’s BIM competence and maturity sections

Pre-Contract EIR

What information client wants to be handed over to operate the building and getting the best out of it

Pre-Contract BEP

BEP is prepared by Frigidmodels to demonstrate his proposed approach, and the capability, capacity and competence

Master Information Delivery Plan (MIDP)

What information is required? Who is responsible for originating this information? In what format the information should be? When is needed?